Fedex Express Terminal
Algood, TN
Clinton Engineering staff worked for the developer as the civil project manager of this design-build project in Algood, TN. The project consisted of a complex 8 acre site with approximately 100 feet of relief across the site and the existence of a spring and stream that required piping/relocation. Clinton Engineering provided the master planning of the site for the conceptual planning budget, site layout, grading and drainage design, retaining wall design, TDEC (Tennessee Department of Environment and Conservation) permitting, storm water detention design, topo survey, construction staking and construction inspection for this project. This project required careful coordination between the developer, Fed-Ex, TDEC and the City of Algood to ensure that the project met the City/State regulations as well as Fed-Ex’s national standards and specifications.